Condition and Inspection Report
5 MVA, 33/11 kV power transformer — listing XL-26-0501 (illustrative)
- Exchange
- Equipment Exchange
- Prepared for
- Sample Energy Ventures Pvt Ltd (illustrative)
- Prepared by
- BARREL Digital Exchange desk
1.Item identification
- Listing reference
- XL-26-0501
- Item
- Two-winding, core-type, oil-immersed distribution transformer
- Serial number
- Recorded on the register; shown only on authorised disclosure
- OEM / model
- Illustrative Transformer Works Ltd, ITW-5000 (illustrative)
- Rating
- 5,000 kVA ONAN, 33/11 kV, vector group Dyn11, 50 Hz
- Tap changer
- Off-circuit, ±5% in 2.5% steps (5 positions)
- Year of manufacture
- 2016
2.Condition grade and service history
The item is graded Used – tested. The grade rests on the seller's service log, the independent test report of 18 September 2026 and the photographs on file; it is not a statement that the transformer will perform at any particular level after re-energisation.
- Condition grade
- Used – tested
- Operating hours
- Approx. 61,000 h between 2017 and April 2026 (seller's log)
- Last service
- Removed from a 33/11 kV substation in April 2026 after a feeder reconfiguration (seller's declaration)
- Oil
- Mineral oil, approx. 3,900 litres; last filtered June 2026 (seller's declaration)
- Known repairs
- None declared by the seller
3.Visual inspection findings
| Item | Observation | Finding |
|---|---|---|
| Tank and welds | No leaks; surface rust on base channels | Observe |
| HV and LV bushings | Porcelain intact, no cracks; HV bushing oil levels visible | Pass |
| Radiators and valves | All 8 radiators fitted; one valve handle missing | Observe |
| Conservator and breather | Silica gel partly pink; replace before energising | Observe |
| Gaskets | Light weep at LV turret flange, no drip | Observe |
| Nameplate and markings | Legible; matches declared rating and vector group | Pass |
| Paint and corrosion | Approx. 20% surface rust, no pitting | Observe |
| Marshalling box and wiring | Dry, terminals labelled, glands intact | Pass |
4.Electrical test results
Tests were carried out by an independent test agency on 18 September 2026 at the seller's yard, oil temperature 32 °C, and are reproduced from its report. BARREL did not witness the tests.
| Test | Condition | Result | Outcome |
|---|---|---|---|
| Insulation resistance HV–earth | 5 kV DC, 60 s | 2,450 MΩ | Pass |
| Insulation resistance LV–earth | 2.5 kV DC, 60 s | 1,650 MΩ | Pass |
| Insulation resistance HV–LV | 5 kV DC, 60 s | 3,100 MΩ | Pass |
| Polarisation index HV–earth | 10 min / 1 min | 1.6 | Observe |
| Winding resistance HV, tap 3 | Per phase, 30 °C | 1.842 / 1.839 / 1.845 Ω, deviation 0.3% | Pass |
| Winding resistance LV | Per phase, 30 °C | 0.0421 / 0.0419 / 0.0423 Ω, deviation under 1% | Pass |
| Turns ratio, all 5 taps | Three-phase ratio tester | Within 0.2% of nameplate on every tap | Pass |
| Magnetising current | 415 V applied to LV | 0.18 / 0.17 / 0.18 A, balanced | Pass |
| Oil breakdown voltage | 2.5 mm gap, 6 samples | Average 58 kV | Pass |
| Oil moisture content | Laboratory sample | 14 ppm | Pass |
| Dissolved gas analysis | — | Not performed | Not tested |
5.Accessories and storage
- Supplied with the item
- Off-circuit tap switch, Buchholz relay, oil and winding temperature indicators, magnetic oil gauge, pressure relief device, silica-gel breather, 8 radiators, marshalling box, bi-directional rollers
- Not supplied
- HV and LV cable boxes, neutral CT, spare bushings
- Storage condition
- Outdoors on a concrete plinth under a tarpaulin at the seller's yard since April 2026; oil-filled; breather fitted
- Packing and freight
- Buyer to arrange; approx. 11.5 t gross oil-filled; radiators detachable for transport
6.Warranty, return and inspection terms
Warranty: the seller offers 90 days from delivery against latent defects notified in writing. Transport damage, site faults and consequential loss are excluded. These are the seller's terms and bind the seller, not BARREL.
Return: a return is accepted within 15 days of delivery for a documented nonconformity against this report, with freight for the buyer's account unless agreed otherwise in the purchase order.
Inspection: available by appointment at the seller's yard with three working days' notice. The buyer may appoint its own test agency at its own cost, and the seller will make the item available for a witnessed re-test of the items listed above.
7.Verification record
- Trust label
- BARREL reviewed
- Documents checked
- Seller's purchase invoice (2016), asset register extract, independent test report of 18 September 2026, oil test certificate, 24 photographs
- Checked on
- 28 October 2026
- What was checked
- Consistency between nameplate, invoice and test report; seller's ownership declaration against the documents; photographs match the described item; test values within the ranges usually seen for this class
- What was not checked
- Tests were not witnessed; no dissolved gas analysis, internal inspection or dismantling; no site survey; no check of the item's suitability for the buyer's application
- Prepared by
- BARREL Equipment Desk (illustrative)