Ref. XR-26-0601
03 November 2026
Green Open Access Eligibility and Landed-Cost Report
Illustrative screen of a 5 MW round-the-clock green supply for an industrial consumer in Maharashtra
- Exchange
- Power Trading
- Prepared for
- Sample Energy Ventures Pvt Ltd (illustrative)
- Prepared by
- BARREL Digital Exchange desk
1.Consumer facts (as declared)
- State
- Maharashtra
- Consumer category
- HT industrial, steel plant, Raigad district
- Sanctioned load
- 7,500 kVA
- Supply voltage
- 33 kV
- Contract demand
- 7,000 kVA
- Annual consumption
- 48.6 million kWh from 12 months of bills (self-declared)
- Average drawal
- About 5.8 MW; night load close to day load
- Existing arrangements
- No open-access, captive or group-captive supply today (self-declared)
2.Eligibility screen
Green open access is available to a consumer whose contracted demand or sanctioned load is 100 kW or more. At 7,000 kVA this consumer clears the threshold many times over, so the question is not whether it qualifies but on what terms the state's green open access framework applies to it.
- 100 kW threshold
- Passed: contract demand 7,000 kVA
- Connection level
- 33 kV, intra-state; both the transmission and the distribution network are used
- State notes
- Charges are set yearly by the state regulator; banking of green energy is allowed within limits against a charge in kind; no outstanding dues may be pending; a standby arrangement with the DISCOM is advisable
- Metering
- 15-minute interval metering at the 33 kV point is required; the present meter is to be confirmed
3.Supply option considered
- Source
- Illustrative Hybrid Power Co., intra-state portfolio (indicative offer)
- Technology
- Solar and wind with battery storage, pooled by the seller to a 5 MW round-the-clock schedule
- Delivery point
- Consumer's 33 kV metering point via the state transmission and distribution network
- Term
- 15 years, with a review of the delivered profile after 12 months
- Contracted energy
- 5 MW in all blocks: 43.8 million kWh a year at 100 percent; 37.2 million kWh at the 85 percent delivery assumed here
- Renewable attributes
- Transferred to the consumer
4.Landed-cost build-up (illustrative, ₹ per kWh)
Figures are rounded, use charge levels typical of a 33 kV intra-state consumer and are for screening only. The two surcharge lines change with each tariff order and may be reduced or waived for green supply; the energy charge is the seller's indicative offer, not a contract price.
| Component | ₹ per kWh | Basis |
|---|---|---|
| Energy charge at the delivery point | 3.85 | Seller's indicative round-the-clock offer |
| Transmission charge (state) | 0.30 | Capacity charge spread over 37.2 million kWh |
| Wheeling charge (DISCOM, 33 kV) | 0.25 | Current schedule, illustrative |
| Cross-subsidy surcharge | 0.90 | Illustrative; may be lower for green open access |
| Additional surcharge | 0.45 | Illustrative; may be reduced in some cases |
| Transmission and wheeling losses | 0.18 | 4.5 percent in kind, valued at the energy charge |
| Banking | 0.06 | 8 percent in kind on the 20 percent of energy assumed banked |
| Scheduling and operating charges | 0.03 | Load despatch and agent fees, illustrative |
| Landed cost | 6.02 | Sum of the above, before electricity duty and taxes |
5.Comparison with current tariff (illustrative)
The 11.4 million kWh the plant uses beyond the assumed delivery, and any shortfall in the delivered profile, continue to be bought from the DISCOM at the current tariff. The difference shown is on the contracted energy only and narrows if the seller delivers less than assumed.
The two surcharge lines are the largest uncertainty: together they are ₹ 1.35 of the ₹ 6.02. They are revised with each tariff order and the treatment of green open access differs by state and by year, so the screen should be rerun on the order in force when the application is filed.
A round-the-clock profile from solar, wind and storage depends on the seller's storage dispatch and on banking being available in the shape assumed. Standby power during outages and the balance drawal above 5 MW stay with the DISCOM; the cost of standby and of any deviation charges is not included.
| Item | Current DISCOM supply | Green open access option |
|---|---|---|
| Energy charge, ₹ per kWh | 8.10 | 6.02 landed |
| Fuel and power purchase adjustment | 0.40 | Not applicable to open-access energy |
| Effective energy rate, ₹ per kWh | 8.50 | 6.02 |
| Demand charges on 7,000 kVA | Paid to the DISCOM | Still paid to the DISCOM; unchanged |
| Electricity duty and taxes | Applied | Applied on the same basis; excluded here |
| Annual cost on 37.2 million kWh | ₹ 31.6 crore | ₹ 22.4 crore |
| Indicative difference | — | About ₹ 9.2 crore a year, before standby, deviation and balance-drawal costs |
6.Next steps
- 1. Consumer
- Share 12 months of bills and the sanctioned-load letter for a document check; confirm the 15-minute meter
- 2. Seller
- Confirm connectivity status and delivery-point feasibility with the state transmission utility
- 3. Both, under NDA
- Exchange block-wise load and generation profiles; BARREL's desk issues an indicative term sheet, then a counterparty credit review and the form of credit support
- 4. Open access
- The consumer, or its authorised agent, files the application on the state portal with the DISCOM's intimation
- 5. PPA
- Negotiate with legal advisers in the deal room; scheduling and settlement by the authorised parties after signing